CCST @ MIT
|| Home || Technology Overview || Bibliography || CSI || Forums || Research || Tools || Links || Contact ||
Carbon Dioxide Storage Only Projects

Click on Project Name to go to Fact Sheet

Project
Leader
Location
CO2 Source
Size Mt/Yr
CO2 Sink
Start
Statoil
Norway
Gas Process
1
Brine Res
1996
Pan Canadian
Canada
Coal Gas.
1
EOR
2000
BP
Algeria
Gas Process
1.2
Depleted Gas Res
2004
Gaz de France
Netherlands
Gas Process
0.2
Depleted Gas Res
2004
Apache
Canada
Gas Process
0.067
EOR
2006
Statoil
Norway
LNG Process
0.7
Depleted Gas Res
2008
CO2CRC
Australia
Natural Dep.
0.1
Depleted Gas Res
2008
CO2Sink
Germany
H2 Prod.
0.03
Sandstone Res
2008
MRCSP
IL, USA
Ethanol Prod
1
Brine Res
2009
Chevron Texaco
Australia
Gas Process
3.3
Brine Res
2009
SECARB
Miss, USA
Gas Process
1
Brine Res
2008-9
SWP
CO/WY USA
Gas Process
2.1
Brine Res
2008-12
PCOR
Canada
Gas Process
1.8
Brine Res
2009-15
Rohoel
Austria
Industrial
0.3
Depleted Gas Res
TBD
Repsol
Spain
Refinery
0.5
Depleted OIl Res
TBD

Abbreviations used:
EOR = Enhanced Oil Recovery
Gas Process = Gas Processing
Coal Gas = Coal Gassification
LNG Process = Liquid Natural Gas Processing
Natural Dep = Natural Deposit
H2 Prod = Hydrogen Gas Production
Brine Res = Brine Reservoir
Depleted Gas Res = Depleted Gas Reservoir
Depleted Oil Re s= Depleted Oil Reservoir
Sandstone Res = Sandstone Reservoir
TBD = To Be Decided

Date modified May 07, 2008

Please send any comments, additions or corrections to javedan@mit.edu

:: E40-445 : 77 Massachusetts Avenue : Cambridge MA 02139 :: c s i @ m i t . e d u ::