Contact UsMIT MITei

Non-Power Plant Carbon Dioxide Capture and Storage Projects

Click on Project Name to go to Fact Sheet
Click on country name to go to regional financial summary

USA

Project

Leader

CO2 Source

Size Mt/yr

CO2 Sink

Status

Location

La Barge

Exxon Mobil

Gas Processing

6

EOR

Operational 2008

Wyoming

Cranfield

SECARB

Natural Source

1-1.5

EOR

Operated
2008-2009

Mississippi

Citronelle

SECARB

Carbon Capture

0.25

Saline

Operational June 2011

Alabama

Decatur

Archer Daniels Midland

Ethanol Production

1

Saline

Operational November 2011

Illinois

Port Arthur

Air Products

Steam-Methane

1

EOR

Operational January 2013

Texas

Kevin Dome

Big Sky

Natural Source

0.125

Saline

Planning

Montana

Wasatch Plateau

SWP

Natural Source

1

Saline

Planning

Utah

Lake Charles

Leucadia Energy

Methanol Production

4.5

EOR

Planning

Louisiana

Bell Creek

PCOR

Gas Processing

1

EOR

Planning

Montana

Otsego County

MRCSP

Gas Processing

TBD

Saline

Planning

Michigan

Canada

Project

Leader

CO2 Source

Size Mt/yr

CO2 Sink

Status

Location

Weyburn

Pan Canadian

Coal Gasification

1

EOR

Operational November 2000

Saskatchewan

Zama

Apache & PCOR

Gas Processing

0.067

EOR

Operational
July 2006

Alberta

Fort Nelson

PCOR

Gas Processing

1.2

Saline

Planning

British Columbia

Quest

Shell

Steam-Methane

1.2

Saline

Planning

Alberta

Swan Hills

Swan Hills Synfuels

In situ Coal Gasification

1.3

EOR

Planning

Alberta

Alberta Carbon Trunk Line

Enhance Energy

Refinery

up to 14.7

EOR

Planning

Alberta

Europe

Project

Leader

CO2 Source

Size Mt/yr

CO2 Sink

Status

Location

Sleipner

StatoilHydro

Gas Processing

1

Saline

Operational August 1996

Norway

Ketzin

GFZ

H2 Production

0.06

Saline

Operational June 2008

Germany

Snohvit

StatoilHydro

LNG Processing

0.7

Depleted Gas

Operational October 2007

Norway

ULCOS Florange

ArcelorMittal

Steel Production

0.7

Saline

Planning

France

Green Hydrogen

Air Liquide

H2 Production

0.55

EOR

Planning

Netherlands

Rest of the World

Project

Leader

CO2 Source

Size Mt/yr

CO2 Sink

Status

Location

In Salah

BP

Gas Processing

1.2

Depleted Gas

Operated
2004-2011

Algeria

Otway

CO2CRC

Natural Deposit

0.1

Depleted Gas

Operational January 2008

Australia

Ordos

Shenhua group

Liquefaction

1

EOR / Saline

Operational August 2010

China

Gorgon

Chevron

Gas Processing

3.3

Depleted Gas

Under Construction

Australia

Mussafah

Masdar

Steel Industry

0.8

EOR

Planning

UAE

 

Abbreviations used:
EOR = Enhanced Oil Recovery
LNG Processing = Liquid Natural Gas Processing
H2 Production = Hydrogen Gas Production
Depleted Gas = Depleted Gas Reservoir
Saline= Saline Reservoir
Steam-Methane= Steam to Methane Reformers
TBD = To Be Decided

Date Modified May 13, 2013