Power Plant Carbon Dioxide Capture and Storage Projects
Click on the Projects' Name to go to its Fact Sheet
Index of Abbreviations are located at the bottom of the page
Click on country name to go to regional financial summary
Large scale Power Plant CCS Projects Worldwide |
| USA |
Project Name |
Leader |
Feedstock |
Size MW |
Capture Process |
CO2 Fate |
Status |
Location |
Trailblazer |
Tenaska |
Coal |
765 |
Post |
EOR |
Planning |
Texas |
Kemper County |
Southern |
Coal |
582 |
Pre |
EOR |
Under Construction |
Mississippi |
TCEP |
Summit Power |
Coal |
400 |
Pre |
EOR |
Planning |
Texas |
WA Parish |
NRG Energy |
Coal |
240 |
Post |
EOR |
Planning |
Texas |
HECA |
SCS |
Petcoke |
400 |
Pre |
EOR |
Planning |
California |
FutureGen |
FutureGen Alliance |
Coal |
200 |
Oxy |
Saline |
Planning |
Illinois |
| Canada |
Project Name |
Leader |
Feedstock |
Size MW |
Capture Process |
CO2 Fate |
Status |
Location |
Boundary Dam |
SaskPower |
Coal |
110 |
Post |
EOR |
Under Construction |
Saskatchewan |
Bow City |
BCPL |
Coal |
1000 |
Post |
EOR |
Planning |
Alberta |
| European Union |
Project Name |
Leader |
Feedstock |
Size MW |
Capture Process |
CO2 Fate |
Status |
Location |
Ferrybridge |
SSE |
Coal |
500 |
Post |
Depleted
Oil |
Construction of Pilot |
UK |
ROAD |
E.ON |
Coal |
250 |
Post |
Saline |
Planning |
Netherlands |
Compostilla |
ENDESA |
Coal |
323 |
Oxy |
Saline |
Planning |
Spain |
Getica |
Turceni Energy |
Coal |
330 |
Post |
Saline |
Planning |
Romania |
Peterhead |
Shell and SSE |
Gas |
385 |
Post |
Depleted Gas |
Planning |
UK |
Don Valley Power Project |
2Co Energy |
Coal |
920 |
Pre |
EOR |
Planning |
UK |
| Teesside Low Carbon |
Progressive |
Coal |
400 |
Pre |
Depleted
Oil |
Planning |
UK |
| Killingholme |
C.GEN |
Coal |
430 |
Pre |
Saline |
Planning |
UK |
White Rose |
Capture Power |
Coal |
426 |
Oxy |
Saline |
Planning |
UK |
Porto Tolle |
ENEL |
Coal |
250 |
Post |
Saline |
Planning |
Italy |
| Captain |
Summit Power |
Coal |
400 |
Post |
Depleted
Oil |
Planning |
UK |
Magnum |
Nuon |
Various |
1200 |
Pre |
EOR/ EGR |
Planning |
Netherlands |
| Norway |
Project Name |
Leader |
Feedstock |
Size MW |
Capture Process |
CO2 Fate |
Status |
Location |
Mongstad |
Statoil |
Gas |
350 |
Post |
Saline |
Operational May 2012 |
Norway |
Longyearbyen |
Unis CO2 |
Coal |
N/A |
N/A |
Saline |
Planning |
Norway |
| Rest of the World |
Project Name |
Leader |
Feedstock |
Size MW |
Capture Process |
CO2 Fate |
Status |
Location |
Daqing |
Alstom & Datang |
Coal |
350 |
Oxy |
EOR |
Planning |
China |
HPAD |
Masdar |
Gas |
400 |
Pre |
EOR |
Planning |
UAE |
GreenGen |
GreenGen |
Coal |
250/400 |
Pre |
Saline |
Planning |
China |
| Pilot CCS Projects |
Project Name |
Leader |
Feedstock |
Size MW |
Capture Process |
CO2 Fate |
Status |
Location |
Schwarze Pumpe |
Vattenfall |
Coal |
30 |
Oxy |
Depleted Gas |
Operational September 2008 |
Germany |
ECO2 Berger |
Powerspan |
Coal |
1 |
Post |
Vented |
Operated 2008- 2010 |
OH, USA |
Pleasant Prairie |
Alstom |
Coal |
5 |
Post |
Vented |
Operated 2008-2009 |
WI, USA |
AEP Mountaineer |
AEP |
Coal |
30 |
Post |
Saline |
Operated 2009-2011 |
WV, USA |
Karlshamn |
E.ON |
Oil |
5 |
Post |
Vented |
Operated 2009 |
Sweden |
Shidongkou |
Huaneng |
Coal |
0.1Mt/yr |
Post |
Commercial use |
Operational 2009 |
China |
Lacq |
Total |
Oil |
35 |
Oxy |
Depleted Gas |
Operational 2010 |
France |
Puertollano |
ELCOGAS |
Coal |
14 |
Pre |
Recycled |
Operational September 2010 |
Spain |
Brindisi |
Enel &Eni |
Coal |
48 |
Post |
EOR |
Operational March 2011 |
Italy |
Buggenum |
Vattenfall |
Coal |
20 |
Pre |
Vented |
Operational May 2011 |
Netherlands |
Ferrybridge |
SSE |
Coal |
5 |
Post |
Depleted Oil |
Operational November 2012 |
UK |
Mongstad |
Statoil |
Gas |
0.1Mt/yr |
Post |
Saline |
Operational May 2012 |
Norway |
Plant Barry |
Southern Energy |
Coal |
25 |
Post |
EOR |
Operational August 2012 |
AL, USA |
Callide-A Oxy Fuel |
CS Energy |
Coal |
30 |
Oxy |
Saline |
Operational December 2012 |
Australia |
Aberthaw |
RWE |
Coal |
3 |
Post |
N/A |
Operational January 2013 |
Wales, UK |
Big Bend Station |
Siemens |
Coal |
1 |
Post |
Vented |
Planning |
FL, USA |
Polk |
Tampa Electric |
Coal |
0.3Mt/yr |
Post |
Saline |
Planning |
FL, USA |
Compostilla |
ENDESA |
Coal |
30 |
Oxy |
Saline |
Planning |
Spain |
|
Abbreviations used:
Oxy = Oxyfuel Combustion Capture
Pre = Pre Combustion Capture
Post = Post Combustion Capture
EOR = Enhanced Oil Recovery
EGR = Enhanced Gas Recovery
Saline = Saline Formation
Depleted Gas = Depleted Gas Reservoir
Depleted Oil = Depleted Oil Reservoir
TBD = To Be Decided
Date modified
May 13, 2013
Please send any comments, additions or corrections to javedan@mit.edu