Lianyungang Project Sheet: Carbon Dioxide Capture and Storage Project

Company/Alliance: Summit Power, National Grid, CO2DeepStore

Location: Lianyungang Clean Energy Innovation Industrial Park Ltd., Lianyungang, Jiangsu Province, China

Feedstock: Coal

Size: 1200 MW. 1Mt/yr

Capture Technology: IGCC Pre-combustion

CO2 Fate: Pipeline 100km to either Binhai for Saline aquifers or 200km to North Jiangsu oilfields for use as EOR

Timing: Start (2015)

Motivation/Economics:

No project costs are available

Comments:

The project is currently in the planning phase and awaiting approval from the National Development and Reform Commission.

The facility, which would also co-produce syngas and chemicals, will be built alongside a 1300MW ultra-supercritical pulverised coal power plant.

Project Link: Lianyungang IGCC with CO2 Capture Project

Other Sources and Press Releases:
The development of IGCC, Co-production and CCS in China (December 2009)