Project: Lianyungang
Company/Alliance: Summit Power, National Grid, CO2DeepStore
Location: Lianyungang Clean Energy Innovation Industrial Park Ltd., Lianyungang, Jiangsu Province, China
Feedstock: Coal
Size: 1200 MW. 1Mt/yr
Capture Technology: IGCC Pre-combustion
CO2 Fate: Pipeline 100km to either Binhai for Saline aquifers or 200km to North Jiangsu oilfields for use as EOR
Timing: Start (2015)
Motivation/Economics:
No project costs are available
Comments:
The project is currently in the planning phase and awaiting approval from the National Development and Reform Commission.
The facility, which would also co-produce syngas and chemicals, will be built alongside a 1300MW ultra-supercritical pulverised coal power plant.
Project Link: Lianyungang IGCC with CO2 Capture Project
Other Sources and Press Releases:
The development of IGCC, Co-production and CCS in China (December 2009)